Load-bearing walls - Frankfurt Höchst, Germany
Preparation of a 3D model as well as overview and reinforcement drawings for a new fireproof wall in the Industrial park Höchst, Germany


Brief description of the project
As part of the change of usage of an existing building in the industrial park Höchst in Frankfurt, Germany a 3D Modell as well as all the corresponding reinforcement drawings for а new fireproof cantilevered wall (h~4m) on the building´s roof need to be carried out which connects to an existing concrete structure
Our contribution
3D modelling of the wall incl. reinforcement in TEKLA structures
Preparation of reinforcement drawings
Volume of steel structures
- Concrete – ~ 5 m³
- Reinforcing steel – ~1 to
Implementation period
- 2025