Shaft pit - Frankfurt Höchst, Germany

Preparation of overview and reinforcement drawings for the shaft pit and engine room of a new steel elevator system in the industrial park Höchst in Frankfurt, Germany

Brief description of the project

For the installation of a new elevator system in the industrial park Höchst in Frankfurt, Germany a 3D Modell as well as all the corresponding overview and reinforcement drawings for the shaft pit and for the engine room need to be carried out

Our contribution

3D modelling of the structure in TEKLA structures incl. reinforcemens

Preparation of overview drawings for the shaft pit and the engine room

Preparation of reinforcement drawings for the shaft pit and the engine room

Volume of steel structures

  • Concrete – ~ 5 m³
  • Reinforcing steel – ~1 to
  • Concrete ~ 15m³

Implementation period

  • 2025