Additional column - Frankfurt Höchst, Germany
Overview and reinforcement drawings for an additional column of an existing piperack structure in the industrial park Höchst in Frankfurt, Germany



Brief description of the project
Overview and reinforcement drawings for the reinforcement of an existing piperack structure in the industrial park Höchst in Germany need to be carried out
Our contribution
Preparation of the corresponding overview and reinforcement drawings
3D modelling of the structure in TEKLA structures
Volume of steel structures
- Steel ~ 3 t.
- Reinforcement steel ~ 2 t.
- Concrete ~ 15 m³
Implementation period
- 2025
